IEC 62058-11-2008 PDF

IEC 62058-11-2008 PDF

Electricity metering equipment (AC)-Acceptance inspection-Part 11: General acceptance inspection methods

$239.59 $479.18 -50%
Product Code: IEC 62058-11
Stock In Stock
Edition: 1.0
Published: 09/2008
Number of Pages: 168
File Size: 1 file, 1 Byte

Available Options

Product Description

Electricity metering equipment (AC) – Acceptance inspection – Part 11: General acceptance inspection methods

Introduction: This part of IEC 62058 describes – based on relevant standards established by ISO TC 69 SC 5 – general acceptance inspection methods of newly manufactured electricity meters, supplied in lots of 50 and above. The method of acceptance of smaller lots should be agreed upon by the manufacturer and the customer. In this standard, it has been taken into account that modern, automated manufacturing processes operated under quality management systems allow to keep the quality level under tight control. This standard, together with IEC 62058-21, containing particular requirements for acceptance inspection of electromechanical meters for active energy, and IEC 62058-31, containing particular requirements for acceptance inspection of static meters for active energy, cancels and replaces the following standards: IEC 60514: Acceptance inspection of class 2 alternating-current watt-hour meters and IEC 61358: Acceptance inspection for direct connected alternating current static watt-hour meters for active energy (classes 1 and 2). Main changes in this standard compared to those earlier standards: it is based on the latest standards established by ISO TC 69 SC 5; the rules for switching between normal, tightened and reduced inspection have been adopted; the procedures for inspection of isolated lots have been adopted; the procedures for skip-lot sampling have been adopted; for inspection by variables, the “R” method has been eliminated and the “σ” method has been adopted.

Scope: The general acceptance inspection methods specified in this part of IEC 62058 apply to newly manufactured electricity meters produced and supplied in lots of 50 and above.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope
  • 3.10 Outgoing quality concepts
  • 3.11 Other terms
  • 5.10 Producer’s risks (PR) and consumer’s risk (CR)
  • 5.11 AQL, PRQ, LQ and CRQ
  • 5.12 Switching rules for normal, tightened and reduced inspection
  • 5.13 Inspection level
  • 5.14 Sample size code letter
  • 5.15 Place of inspection
  • 5.16 Submission of product for acceptance inspection
  • 5.17 Drawing of samples
  • 5.18 Acceptability of lots
  • 100 % inspection

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 62058-11-2008 PDF

IEC 62058-11-2008 PDF

$239.59 $479.18