IEC TS 62600-103-2024 PDF

IEC TS 62600-103-2024 PDF

Marine energy-Wave, tidal and other water current converters-Part 103: Guidelines for the early stage development of wave energy converters-Best practices and recommended procedures for the testing of pre-prototype devices

$239.59 $479.18 -50%
Product Code: IEC TS 62600-103
Stock In Stock
Edition: 2.0
Published: 07/2024
Number of Pages: 70
File Size: 1 file, 1 Byte

Available Options

Product Description

Marine energy – Wave, tidal and other water current converters – Part 103: Guidelines for the early stage development of wave energy converters – Best practices and recommended procedures for the testing of pre-prototype devices

Introduction: Developing wave energy converters (WECs) will always be a demanding engineering process. It is important, therefore, to follow a design path that will minimise the risks encountered along a route of increasing technical complexity and fiscal commitment. This document presents a guide that addresses these issues, the approach being based on a proven methodology adapted from other technology areas, especially NASA and similar heavy maritime engineering industries. The scope of the work is defined in Clause 1. Normative references and definitions of important terms are introduced in Clause 2 and Clause 3 respectively. The core of the document then follows a twin-track approach, relying on: a) a structured or staged development approach outlined in Clause 4, and b) a set of model specific and goal orientated clauses (Clause 9 to Clause 11) ensuring that targets are clearly defined and attained with confidence. Testing specific requirements such as test planning (Clause 5), reporting and presentation (Clause 6), characterisation of the surrounding wave environment (Clause 7), data acquisition and real-time control (Clause 8), and testing uncertainty Clause 12 are also included. The structured development schedule makes use of the ability to accurately scale wave energy converters such that sub-prototype size physical models can be used to investigate the relevant device parameters and design variables at an appropriate dimension and associated budget. The parallel development of m

Scope: This part of IEC TS 62600 is concerned with the sub-prototype scale development of wave energy converters (WECs). It includes wave tank test programmes, where wave conditions are controlled so they can be scheduled, and first sea trials, where sea states occur naturally and the programmes are adjusted and flexible to accommodate the conditions. Commercial-scale prototype tests are not covered in this document. This document prescribes the minimum test programmes that form the basis of a structured technology development schedule. For each testing campaign, the prerequisites, goals and minimum test plans are specified. This document addresses: Planning an experimental programme, including a design statement, technical drawings, facility selection, site data and other inputs as specified in Clause 5. Device characterisation, including the physical device model, PTO components and mooring arrangements where appropriate. Environment characterisation, concerning either the tank testing facility or the sea deployment site, depending on the stage of development. Specification of specific test goals, including power conversion performance, device motions, device loads and device survival. Guidance on the measurement sensors and data acquisition packages is included but not dictated. Provided that the specified parameters and tolerances are adhered to, selection of the components and instrumentation can be at the device developer’s discretion. An important element of the test protocol is to define the limitations and accuracy of the raw data and, more specifically, the results and conclusion drawn from the trials. A methodology addressing these limitations is presented with each goal, so the plan always produces defendable results of defined uncertainty. This document serves a wide audience of wave energy stakeholders, including device developers and their technical advisors; government agencies and funding councils; test centres and certification bodies; private investors; and environmental regulators and NGOs.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope
  • Scope
  • Scope
  • Scope

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC TS 62600-103-2024 PDF

IEC TS 62600-103-2024 PDF

$239.59 $479.18