ISO 16484-6-2026 PDF

ISO 16484-6-2026 PDF

Building automation and control systems (BACS)-Part 6: Data communication conformance testing

$60.00 $120.00 -50%
Product Code: ISO 16484-6
Stock In Stock
Edition: 6.
Published: 02/2026
Number of Pages: 1050
File Size: 1 file, 13 MB

Available Options

Product Description

Systèmes d’automatisation et de gestion technique du bâtiment - Partie 6: Essais de conformité de la communication de données

Scope: This standard provides a comprehensive set of procedures for verifying the correct implementation of each capability claimed on a BACnet PICS including: (a) support of each claimed BACnet service, either as an initiator, executor, or both, (b) support of each claimed BACnet object-type, including both required properties and each claimed optional property, (c) support of the BACnet network layer protocol, (d) support of each claimed data link option, and (e) support of all claimed special functionality. 3. DEFINITIONS All definitions from ANSI/ASHRAE Standard 135-2020 also apply to this addendum. 3.1 Terms Adopted from International Standardss local network: the network to which a BACnet device is directly connected. remote network: a network that is accessible from a BACnet device only by passing through one or more routers. test database: a database of BACnet functionality and objects created by reading the contents of an EPICS. 3.2 Abbreviations and Acronyms Used in the Standard BNF Backus-Naur Form syntax EPICS electronic protocol implementation conformance statement IUT implementation under test TCSL testing and conformance scripting language TD testing device TPI text protocol information 3.3 Common language used in tests 'any valid value': Any valid value refers to any value of the correct data type and within the vendor's range specified for the property this is applied to. 'any appropriate password': Any password that meets the Configuration Requirements specified in the test or test section. Passwords when required by the vendor are required to be no more than 20 characters. 'reset': Some tests require to reset the IUT. Reset includes power cycle via switch, power cycle via loss of power, and reinitializeDevice WARMSTART. As defined by the BACnet standard, "WARMSTART shall mean to reboot the device and start over, retaining all data and programs that would normally be retained during a brief power outage."

Contents:

  • FOREWORD
  • SCOPE

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ISO 16484-6-2026 PDF

ISO 16484-6-2026 PDF

$60.00 $120.00