PURPOSE AND USE OF THIS STANDARD The success of any design or construction project is determined by various factors, including those related to cost, schedule, and quality. A project’s final cost compared to its expected cost is a key metric for owners, designers, and contractors. Total project cost is composed of subcosts including • Labor, • Materials, • Construction equipment, • Subcontractors, • Design, and • Overhead. The cost of labor is typically the component with the greatest variability, and it is determined by a combination of factors including • Work scope definition, • Quantities, • Design, • Crew composition, • Hourly crew costs, and • Crew productivity. Because labor is such a significant portion of overall project costs, a loss of productivity typically results in a significant amount of increased costs and reduced contractor profit. The purpose and use of this standard is to help prevent, minimize, and resolve disputes over identifying, quantifying, and proving the loss of productivity on a project. The term productivity is most often presented in this standard in the context of construction craft workers. However, the concepts and principles presented herein are also applicable to the productivity of designers, subcontractors, fabricators, construction equipment, and managers. Productivity can vary from the level anticipated in the budget because actual factors encountered on the project may differ from factors anticipated at the time of bid for any number of reasons. These disruptive factors may include • Schedule delay, • Acceleration, • Differing site conditions, • Out-of-sequence work, • Labor availability, • Stacking of trades, • Excessive overtime, • Seasonal and weather conditions, • Design changes, • Cumulative impact of multiple changes, •