ASHRAE Guideline 1.5-2025 PDF

ASHRAE Guideline 1.5-2025 PDF

Application of the Commissioning Process for Smoke Control Systems

$46.00 $92.00 -50%
Product Code: ASHRAE Guideline 1.5
Stock In Stock
Published: 2025
Number of Pages: 36
File Size: 1 file, 730 KB

Available Options

Product Description

Commissioning Process The Commissioning Process (Cx) – described in ASHRAE Guideline 0 and ASHRAE/IES Standard 202 – is a quality-oriented process for verifying and documenting that the performance of facilities, systems, and assemblies meet defined objectives and criteria. ASHRAE Guideline 1.5 describes the technical requirements for the application of the Cx that will verify the smoke control system fulfills the Owner’s Project Requirements (OPR). The guideline incorporates committee experience on projects where smoke control systems and components were expected to work from the day the project was turned over to the Owner, while meeting the requirements of Owners, occupants, users, and facility operations maintenance service organizations at a high level of satisfaction.

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ASHRAE Guideline 1.5-2025 PDF

ASHRAE Guideline 1.5-2025 PDF

$46.00 $92.00