ASME NOG-1-2025 PDF

ASME NOG-1-2025 PDF

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

$125.00 $250.00 -50%
isbn 9780791877647
Product Code: ASME NOG-1
Stock In Stock
Published: 03/18/2026
Number of Pages: 207
File Size: 1 file, 4 Bytes

Available Options

Product Description

ASME NOG-1 gives the rules for construction of overhead and gantry cranes with top running bridges and multiple girders, covering the machine as a complete lifting system rather than a collection of parts. The Standard is organised in sections: introduction and scope, quality assurance, coatings and finishes, structural components, mechanical and electrical equipment, inspection and testing, and packaging, shipping, receiving, storage and handling. Section 9000 addresses planned engineered lifts, and additional requirements are given for ASME NOG-1 Type I hoists and trolleys along with recommended practices. The rules are written for crane manufacturers, owners and inspectors who need a consistent basis for design, fabrication and acceptance testing of heavy-duty overhead handling equipment.

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ASME NOG-1-2025 PDF

ASME NOG-1-2025 PDF

$125.00 $250.00