ASME PTC 70-2009 (R2026) PDF

ASME PTC 70-2009 (R2026) PDF

Ramp Rates

$25.00 $50.00 -50%
isbn 9780791831960
Product Code: ASME PTC 70
Stock In Stock
Published: 04/15/2009
Number of Pages: 28
File Size: 1 file, 463 Bytes

Available Options

Product Description

This code provides the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant. It is applicable to all electrical generating facilities, independent of fuel source or prime movers. The load change rate is distinguished by starting from one operating point at steady state condition and transitioning to another. Startup commences at a shutdown condition, or intermediary startup condition, and proceeds to a defined running condition. Shutdown begins at a running condition and proceeds to a shutdown condition or intermediary shutdown condition. Measurements of actual net generation as a function of time are the primary test parameters. Additional data and information will be collected as part of this analysis to determine the long and short term effects of various ramp rates on the equipment and systems in the power plant of interest. This information includes and is not limited to design specifications and actual operating conditions.

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ASME PTC 70-2009 (R2026) PDF

ASME PTC 70-2009 (R2026) PDF

$25.00 $50.00