Fire detection and fire alarm systems for buildings-Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems
Publishing information: This part of BS 5839 is published by BSI Standards Limited, under licence from The British Standards Institution, and came into effect on 31 August 2021. It was prepared by Subcommittee FSH/12/5, Alarm devices, voice alarm evacuation sub-systems and emergency voice communications, under the authority of Technical Committee FSH/12, Fire detection and alarm systems. A list of organizations represented on these committees can be obtained on request to the committee Supersession This part of BS 5839 supersedes BS 5839‑9:2011 , which is withdrawn. Relationship with other publications BS 5839 is published in the following parts: Part 1: Code of practice for design, installation, commissioning and maintenance of systems in non- domestic premises; Part 3: Specification for automatic release mechanisms for certain fire protection equipment; Part 6: Code of practice for the design, installation, commissioning and maintenance of fire detection and fire alarm systems in domestic premises; Part 8: Code of practice for the design, installation, commissioning and maintenance of voice alarm systems; and Part 9: Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems.
Information about this document: This is a full revision of the standard, and introduces the following principal changes: clarification of the three primary applications for emergency voice communication (EVC) systems, namely, fire telephone, refuge intercom and stewards’ telephones at sports grounds; several changes to definitions; introduction of a Type C outstation; clarification of recommendations regarding visual indicators on stewards’ telephones; clarification of recommendations for locations of stewards’ telephones; inclusion of recommendations when more than one master station is provided; changes in recommendations regarding background noise; inclusion of recommendations regarding EVC systems installed on campuses where transmission paths might not meet the recommendations of this standard; mains isolation recommendations brought into line with BS 5839‑1 ; inclusion of recommendations regarding testing of non-EVC mode devices that might be provided; and inclusion of new normative annex regarding calculating standby battery capacity. BRITISH STANDARD This publication can be withdrawn, revised, partially superseded or superseded. Information regarding the status of this publication can be found in the Standards Catalogue on the BSI website at bsigroup.com/standards, or by contacting the Customer Services team. Where websites and webpages have been cited, they are provided for ease of reference and are correct at the time of publication. The location of a webpage or website, or its contents, cannot be guaranteed.
Use of this document: As a code of practice, this British Standard takes the form of recommendations and guidance. It is not to be quoted as if it were a specification. Users are expected to ensure that claims of compliance are not misleading. Users may substitute any of the recommendations in this British Standard with practices of equivalent or better outcome. Any user claiming compliance with this British Standard is expected to be able to justify any course of action that deviates from its recommendations.
Presentational conventions: The provisions of this standard are presented in roman (i.e. upright) type. Its recommendations are expressed in sentences in which the principal auxiliary verb is “should”. Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element. Where words have alternative spellings, the preferred spelling of the Shorter Oxford English Dictionary is used (e.g. “organization” rather than “organisation”). The word “should” is used to express recommendations of this standard. The word “may” is used in the text to express permissibility, e.g. as an alternative to the primary recommendation of the clause. The word “can” is used to express possibility, e.g. a consequence of an action or an event. Notes and commentaries are provided throughout the text of this standard. Notes give references and additional information that are important but do not form part of the recommendations. Commentaries give background information.
Scope: This part of BS 5839 provides recommendations for the planning, design, installation, commissioning and maintenance of emergency voice communication (EVC) systems in and around buildings and at sports, entertainment and similar venues. It does not recommend whether or not an emergency voice communication system is installed in a given premises. This part of BS 5839 relates to the use of EVC in communicating with people in refuges, fire wardens, fire marshals and firefighters in firefighting lobbies and communicating with stewards at sporting events. Use, other than in fire emergency situations, by disabled persons and others, although not precluded, is not addressed in detail. Other than in exceptional circumstances, EVC systems are not intended as the means of raising a fire alarm, instead of manual call points. Refer to BS 5839‑1 for guidance on fire detection and alarm systems. This part of BS 5839 covers systems with components linked by wires, wirelessly, or a combination of both. This part of BS 5839 covers EVC systems and is therefore not intended to cover general-purpose intercom systems, lift intercom systems, local (internal) telephone systems for general use, or any external communication systems, such as the public switched telephone network and cellular telephone networks. Voice alarm systems are primarily intended for the automatic broadcasting of evacuation messages; they are covered by BS 5839‑8 and are therefore excluded from this part of BS 5839 .