Process for designing and implementing Biodiversity Net Gain. Specification
Publishing information: This British Standard is published by BSI Standards Limited, under licence from The British Standards Institution, and came into effect on 31 August 2021. It was prepared by Technical Committee BDY/1, Biodiversity management. A list of organizations represented on this committee can be obtained on request to the committee manager. BSI Committee BDY/1 takes collective responsibility for the preparation of this British Standard. The Committee wishes to acknowledge the personal contribution of the late Rachel Hoskin.
Information about this document: This publication can be withdrawn, revised, partially superseded or superseded. Information regarding the status of this publication can be found in the Standards Catalogue on the BSI website at bsigroup.com/standards, or by contacting the Customer Services team. Where websites and webpages have been cited, they are provided for ease of reference and are correct at the time of publication. The location of a webpage or website, or its contents, cannot be guaranteed.
Use of this document: Requirements in this standard are drafted in accordance with Rules for the structure and drafting of UK standards, subclause G.1.1, which states, “Requirements should be expressed using wording such as: ‘When tested as described in Annex A, the product shall ...’”. This means that only those products that are capable of passing the specified test will be deemed to conform to this standard. It has been assumed in the preparation of this British Standard that the execution of its provisions will be entrusted to appropriately qualified and experienced people, for whose use it has been produced.
Presentational conventions: The provisions of this standard are presented in roman (i.e. upright) type. Its requirements are expressed in sentences in which the principal auxiliary verb is “shall”. Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element. Where words have alternative spellings, the preferred spelling of the Shorter Oxford English Dictionary is used (e.g. “organization” rather than “organisation”).
Scope: This British Standard specifies a process to design, implement, maintain and monitor BNG outcomes from a development project. It does not cover the actual delivery of BNG. It provides a framework to demonstrate that a project has followed a process that is based on the UK’s BNG Good Practice Principles [N1]. Complying with the requirements within this British Standard is to follow a process to achieve BNG that is based on good practice. This British Standard is for any sector of industry, including residential, mixed-use, energy, water, transport, communications and infrastructure across the UK. It is for any scale of project from individual house-builds to larger developments, as well as estate management, whether they are subject to consent through the planning system, or another consenting process (e.g. Development Consent Orders) or are classified as permitted development. It can also be used by land managers aiming to generate BNG through management of an estate. Hereafter the term “project” refers to both development projects and land management activities. This British Standard covers terrestrial and freshwater habitats, and intertidal habitats down to the mean low water mark. It is applicable across the UK and for projects that affect biodiversity and those with limited or no impact on biodiversity, as well as projects aiming to achieve BNG on- and/ or off-site. It first sets out requirements that apply throughout the BNG process; these requirements are in Clause 4. Clause 5 to Clause 8 contain requirements for each of these stages of the BNG process: a) Clause 5: Preparation b) Clause 6: Design c) Clause 7: Implementation d) Clause 8: Maintenance and management A project might involve requirements to achieve BNG from, for example, a planning condition or compliance with legislation. This British Standard covers a process to achieve BNG, notwithstanding any such requirements. It does not infer compliance with any planning condition, legislation or statutory