BS 9518-2021 PDF
Processing of alarm signals by an alarm receiving centre. Code of practice
- AA-The Aluminum Association
- AAMI-Association for the Advancement of Medical Instrumentation
- AASHTO-American Association of State Highway and Transportation Officials
- AATCC-American Association of Textile Chemists and Colorists
- ACI-American Concrete Institute
- ANSI-American National Standards Institute
- API-American Petroleum Institute
- AS-Standards Australia
- ASABE-American Society of Agricultural and Biological Engineers (Formerly ASAE)
- ASCE-American Society of Civil Engineers
- ASHRAE-American Society of Heating, Refrigerating, and Air Conditioning Engineers
- ASME-ASME International
- ASTM-ASTM International
- AWS-American Welding Society
- AWWA-American Water Works Association
- BS-BSI Group
- ISO-International Organization for Standardization
- IEC-International Electrotechnical Commission
- IEEE-Institute of Electrical and Electronics Engineers
- SAE-SAE International
- UL-Underwriters Laboratories
- UNE-Asociación Española de Normalización
Your shopping cart is empty!
Product Description
Processing of alarm signals by an alarm receiving centre. Code of practice
Publishing information: This British Standard is published by BSI Standards Limited, under licence from The British Standards Institution, and came into effect on 31 July 2021. It was prepared by Subcommittee GW/1/11, Remote centres, under the authority of Technical Committee GW/1, Electronic security systems. A list of organizations represented on these committees can be obtained on request to the committee manager. Supersession This British Standard supersedes BS 8591:2014, which will be withdrawn on 31 July 2022. Relationship with other publications This British Standard has been produced following the publication of BS EN 50518:2019 and is intended to complement that standard by providing UK-specific recommendations for the processing of alarm signals. The UK has produced standards for the planning, construction, facilities and operation of manned and unmanned remote centres since the 1990s. The first of these was BS 5979 (Remote centres receiving signals from fire and security systems – Code of practice), which gave recommendations for the planning, construction and facilities of manned and unmanned remote centres, and for the operation of alarm receiving centres (ARCs) receiving signals from security systems including intruder and hold‑up alarm systems (I&HAS). Following the publication of BS EN 50518, parts 1–3 in 2013, which provided requirements for planning, construction, facilities and for the operation of ARCs receiving signals from I&HAS, BS 5979:2007 was withdrawn. BS 8591 (Remote centres receiving signals from alarm systems – Code of practice) was produced in 2014 following the publication of BS EN 50518 in 2013 to provide recommendations for the planning, construction and facilities of manned and unmanned remote centres, and for the operation of ARCs receiving signals from security systems other than I&HAS. The publication of BS EN 50518:2019 has prompted the development of BS 9518 and the withdrawal in due course of BS 8591. ARCs certificated to BS 5979 or BS 8591 at the date when that British Standard was withdrawn are presently able to maintain certification to BS 5979 or BS 8591 as appropriate, subject to the terms of the certification scheme. BS 5979:2007 and BS 8591:2014 both contained UK procedural and performance recommendations for the processing of signals from alarm systems. These recommendations have been reviewed and updated during the development of BS 9518, with specific changes to procedures to reflect changes in the expectations of UK Emergency Services organizations. As a result of this review and update, there might be conflicts between the procedural and performance recommendations given in BS 9518 and the withdrawn standards (BS 5979 and BS 8591); where such conflict exists, the recommendations in BS 9518 supersede those in BS 5979 or BS 8591. Certification schemes for ARCs to BS EN 50518 may be extended to include certification to BS 9518.
Information about this document: This British Standard covers the alarm handling procedures for ARCs receiving signals from I&HAS, fire alarm systems, social alarm systems, VSS and lone worker devices. BRITISH STANDARD This standard was written to retain those sections of BS 8591 not in conflict with BS EN 50518 and in addition to include alarm handling procedures for alarm types covered in other British Standards, i.e. This publication can be withdrawn, revised, partially superseded or superseded. Information regarding the status of this publication can be found in the Standards Catalogue on the BSI website at bsigroup.com/standards, or by contacting the Customer Services team. Where websites and webpages have been cited, they are provided for ease of reference and are correct at the time of publication. The location of a webpage or website, or its contents, cannot be guaranteed.
Use of this document: As a code of practice, this British Standard takes the form of recommendations and guidance. It is not to be quoted as if it were a specification. Users are expected to ensure that claims of compliance are not misleading. Users may substitute any of the recommendations in this British Standard with practices of equivalent or better outcome. Any user claiming compliance with this British Standard is expected to be able to justify any course of action that deviates from its recommendations.
Presentational conventions: The provisions of this standard are presented in roman (i.e. upright) type. Its recommendations are expressed in sentences in which the principal auxiliary verb is “should”. Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element. Where words have alternative spellings, the preferred spelling of the Shorter Oxford English Dictionary is used (e.g. “organization” rather than “organisation”). The word “should” is used to express recommendations of this standard. The word “may” is used in the text to express permissibility, e.g. as an alternative to the primary recommendation of the Clause. The word “can” is used to express possibility, e.g. a consequence of an action or an event. Notes and commentaries are provided throughout the text of this standard. Notes give references and additional information that are important but do not form part of the recommendations. Commentaries give background information.
Scope: This British Standard gives recommendations for the processing of signals by an alarm receiving centre (ARC) from alarm systems, such as but not limited to fire detection and fire alarm systems, fixed firefighting systems, intrusion and holdup alarm systems, video surveillance systems, social alarms systems, lone worker, and combinations of such systems. NOTE BS EN 50518:2019 provides guidance on planning, construction, systems, management processes, leadership, governance, management and staffing of an alarm receiving centre. BS 5979 and BS 8591 also provide guidance.



