BS PD IEC TS 63265-2022 PDF

BS PD IEC TS 63265-2022 PDF

Photovoltaic power systems. Reliability practices for operation

$172.72 $345.44 -50%
Publisher
isbn 9780539062984
Product Code: BS PD IEC TS 63265
Stock In Stock
Published: 02/02/2023
Number of Pages: 40
File Size: 1 file, 1.2 MB

Available Options

Product Description

Photovoltaic power systems. Reliability practices for operation

Scope: This document outlines methods that can be utilized to ensure reliability throughout the PVPS project phases. It is derived from a management motivation for long lasting and cost-effective energy performance, energy production, secure production and revenue, and safe function. The application of reliability practices in this document is designed to be practical and reduce the costs of unreliability. The reliability planning documents throughout the phases include purpose, scope, limitations, schedule, reference documentation, tasks, and standards. The work products build on the documentation concurrently with the PVPS concept, design, specifications, studies, procurements, and hiring of services. They are consistent with the project implementation scheduling, including financing, insurance, underwriting, or other decisions, specification, design, operating or maintenance planning and activities. It is a phased approach, as there are specific needs for actions by the defined phases, decision process and stakeholders involved. This document further identifies and defines a normative minimum set of processes and tools to meet the requirements of this document. The phases are development, EPC, and O&M. These phases may not be universally applied and different parties in industry may have different nomenclature and organizing principles. It is recognized that some organizations may be vertically organized with multiple capabilities. An owner’s engineer may also have a role. The thrust here is that however organized, the reliability tools, practices, and methods are assigned with needed data collected and preserved for relevant analytics as generally outlined in this document. It includes as a minimum, the identified work products and deliverables in this document identified specifically in Clauses 5, 6, and 7. Integrated reliability products are identified in this document on a task by task progression phased throughout the project. While these tasks are part of the mini

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope
  • Bibliography

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
BS PD IEC TS 63265-2022 PDF

BS PD IEC TS 63265-2022 PDF

$172.72 $345.44