IEC 60794-1-124-2025 PDF

IEC 60794-1-124-2025 PDF

Optical fibre cables-Part 1-124: Generic specification-Basic optical cable test procedures-Mechanical tests methods-Installation test for microduct cabling, Method E24

$50.44 $100.88 -50%
Product Code: IEC 60794-1-124
Stock In Stock
Edition: 1.0
Published: 06/2025
Number of Pages: 34
File Size: 1 file, 881 Bytes

Available Options

Product Description

Optical fibre cables – Part 1-124: Generic specification – Basic optical cable test procedures – Mechanical tests methods – Installation test for microduct cabling, Method E24

Introduction: The national working committee DKE/UK 412.6 "Optical fibres and optical fiber cables" of the DKE German Commission for Electrical, Electronic & Information Technologies (www.dke.de) is responsible for this document. This document was prepared in cooperation with DKE/UK 412.6 "Optical fibres and optical fibre cables". A VDE "application rule" was published in Germany [1]1. Two different blowing routes are presented in this document which can be used to characterize the blowing performance of microduct cables. The first track (Figure 1, Method A) is identical with the track which has been used in IEC 60794-21 Method E24 for many years. Even though the creation of the track seemed to be very simple, it was not used by many facilities because of its excessive length. A 100 m length track requires a lot of space which is not usually available in facilities. It also seemed to be over simplified because only bends of the same curvature were included. The second track (Figure 2, Method B) was designed to include the end-users’ requirements which were to have a more compact set-up (only 45 m between mandrel centres) and to have a more realistic route including curvature changes in bends. ___________ 1 Numbers in square brackets refer to the Bibliography

Scope: This part of IEC 60794 contains test procedures, referred to as Method E24, for evaluating the behaviour of microduct cabling (microduct optical cable, fibre unit or hybrid cable etc.) when blown into a microduct or protected microduct. This document describes two blowing track layouts: Method A consists of two mandrels and two long straight sections in between (same curvature). Method B consists of 3 mandrels. The middle mandrel forces the cable to experience both left- and right-hand bending, which is a feature of any realistic blowing route. In addition, this document describes an optional procedure to check the capability of blowing out an installed cable.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope
  • 3 mandrels

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 60794-1-124-2025 PDF

IEC 60794-1-124-2025 PDF

$50.44 $100.88