Electric railway equipment – Train bus – Part 2: Train communication network conformance testing
Introduction: TCN is an International Standard with the aim of defining interfaces so as to achieve plug-in compatibility: a) between equipment located in different vehicles, and b) between equipment and devices located within the same vehicle. One of the key success factors for deployment of any technology is the standardisation and the ensuring interoperability among various implementations. To facilitate interoperability a conformance test should be implemented. In this part of IEC 61375, the TCN hierarchical structure deals with two levels of busses: a) the train bus called the Wire Train Bus (WTB); b) the vehicle bus called the Multifunction Vehicle Bus (MVB). No other busses are taken into consideration even though they are foreseen by IEC 61375-1, see the note below. WTB and MVB share the same real-time protocols, which offer two communication services: a) process variables, a distributed, real-time database, periodically refreshed through broadcasting; b) messages, transmitted on demand either as: 0. unicast messages (point-to-point) or/and 1. multicast messages. WTB and MVB share common network management, which allows debugging, commissioning and maintenance over the network. NOTE TCN states that several vehicle busses may apply, provided that such busses are able to provide the services of Real_Time Protocols. However, this part of IEC 61375 is focused on MVB as vehicle bus, even if the conformance test may apply to other busses, the exact conformance test should be derived upon
Scope: This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven. The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations. NOTE 1 For a definition of TCN implementation see 1.3. 1.2
Contents:
- FOREWORD
- INTRODUCTION
- Scope