IEC 61558-2-23 (REDLINE + STANDARD)-2024 PDF

IEC 61558-2-23 (REDLINE + STANDARD)-2024 PDF

Safety of transformers, reactors, power supply units and combinations thereof-Part 2-23: Particular requirements and tests for transformers and power supply units for construction sites

$171.50 $342.99 -50%
Product Code: IEC 61558-2-23 (REDLINE + STANDARD)
Stock In Stock
Edition: 3.0
Published: 06/2024
Number of Pages: 74
File Size: 1 file, 1.6 MB

Available Options

Product Description

Safety of transformers, reactors, power supply units and combinations thereof – Part 2-23: Particular requirements and tests for transformers and power supply units for construction sites

Introduction: IEC/TC 96 has a group safety function in accordance with IEC Guide 104 for transformers other than those intended to supply distribution networks, in particular transformers and power supply units intended to allow the application of protective measures against electric shock as defined by TC 64, which is about electrical installations and protection against electric shock, but in certain cases including the limitation of voltage and horizontal safety function for SELV, in accordance with IEC 60364-4-41. The group safety function (GSF) is used because of responsibility for safety extra-low voltage (SELV) in accordance with IEC 61140:2016, 5.2.6 and IEC 60364-4-41:2005, 414.3.1 or control circuits in accordance with IEC 60204-1:2016, 7.2.4. The group safety function is used for each part of IEC 61558-2 because different standards of the IEC 61558 series can be combined in one construction but in certain cases with no limitation of rated output power. For example an auto-transformer in accordance with IEC 61558-2-13 can be designed with a separate SELV-circuit in accordance with the particular requirements for IEC 61558-2-6 relating to the general requirements of IEC 61558-1.

Scope: Replacement: This part of IEC 61558 deals with the safety of transformers for construction sites and power supply units incorporating transformers for construction sites. Transformers incorporating electronic circuits are also covered by this document. NOTE 1 Safety includes electrical, thermal and mechanical aspects. Unless otherwise specified, from here onward, the term transformer covers transformers for construction sites and power supply units incorporating transformers for construction sites. This document is applicable to stationary or portable, single-phase or polyphase, air-cooled (natural or forced) independent or associated transformers, being isolating or safety isolating dry-type transformers for the use on construction sites. The windings may can be encapsulated or non-encapsulated. For power supply units (linear) this document is applicable. For switch mode power supply units, IEC 61558-2-16 is applicable together with this document. Where two requirements are in conflict, the most severe takes precedence. The rated supply voltage does not exceed 1 000 V AC, and the rated supply frequency and the internal operating frequencies do not exceed 500 Hz. This standard used in combination with Part 2-16 for Switch mode power supply units (SMPS) is also applicable to power supplies with internal operating frequencies higher than 500 Hz. Where the two requirements are in conflict the most severe take precedence The rated output does not exceed: 25 kVA for single-phase transformers; 40 kVA for polyphase transformers. This document is applicable to transformers without limitation of the rated output subject to an agreement between the purchaser and the manufacturer. NOTE 2 Transformers intended to supply distribution networks are not included in the scope. Isolating transformers and power supply units incorporating Isolating transformers for construction sites have a no-load output voltage and a rated output voltage exceeding 50 V AC and not exceeding 250 V AC. Safety isolating transformers and power supply units incorporating Safety isolating transformers for construction sites have a no-load output voltage and a rated output voltage not exceeding 50 V AC.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 61558-2-23 (REDLINE + STANDARD)-2024 PDF

IEC 61558-2-23 (REDLINE + STANDARD)-2024 PDF

$171.50 $342.99