High-voltage direct current (HVDC) installations – System tests
Introduction: The standard is structured in eight clauses: a) Clause 1 – Scope b) Clause 2 – Normative references c) Clause 3 – Terms and definitions d) Clause 4 – General Objectives of system tests e) This clause addresses the purpose of this standard, the HVDC system structure, the control and protection structure, the logical steps of commissioning, the structure of the system test and that of the system commissioning standard. f) Clause 5 – Converter station test g) This clause addresses the commissioning of converter units and verifies the steady state performance of units as well as switching tests. h) Clause 6 – Power Transmission tests i) This clause concerns the commissioning of the transmission system, and verifies station coordination, steady-state and dynamic performance, interference, as well as interaction between the d.c. DC and a.c. AC systems. j) Clause 7 – Trial operation k) After completion of the system test, the period of trial operation is normally specified to verify the normal transmission. l) Clause 8 – System test plan and documentation Clauses 5 to 7 comprise individual sections providing an introduction and covering objects objectives, preconditions and procedures and general acceptance criteria as well as detailed descriptions of the individual tests.
Scope: This International Standard applies to system tests for high-voltage direct current (HVDC) installations which consist of a sending terminal and a receiving terminal, each connected to an a.c. AC system. The tests specified in this standard are based on bidirectional monopolar and bipolar high- voltage direct current (HVDC) installations which consist of a sending terminal and a receiving terminal, each connected to an a.c. AC system. The test requirements and acceptance criteria should be agreed for back-to-back installations, while multi-terminal systems and voltage sourced converters are not included in this standard. For monopolar HVDC installations, the standard applies except for bipolar tests. For the special functions or performances that are claimed by specific projects, some extra test items not included in this standard should be added according to the technical specification requirements. This standard only serves as a guideline to system tests for high-voltage direct current (HVDC) installations. The standard gives potential users guidance, regarding how to plan commissioning activities. The tests described in the guide may not be applicable to all projects, but represent a range of possible tests which should be considered. Therefore, it is preferable that the project organization establishes the individual test program based on this standard and in advance assigns responsibilities for various tasks/tests between involved organisations (e.g. user, supplier, manufacturer, operator, purchaser etc.) for each specific project.
Contents:
- FOREWORD
- INTRODUCTION
- Scope