IEC 62313-2009 PDF

IEC 62313-2009 PDF

Railway applications-Power supply and rolling stock-Technical criteria for the coordination between power supply (substation) and rolling stock

$186.00 $371.99 -50%
Product Code: IEC 62313
Stock In Stock
Edition: 1.0
Published: 04/2009
Number of Pages: 104
File Size: 1 file, 1 Byte

Available Options

Product Description

Railway applications – Power supply and rolling stock – Technical criteria for the coordination between power supply (substation) and rolling stock

Scope: This International Standard is intended to be used to set up the requirements for the acceptance of rolling stock on infrastructure in the field of: co-ordination of protection principles between power supply and traction units, especially fault discrimination for short-circuits; co-ordination of installed power on the line and power demand of the trains; co-ordination of traction unit regenerative braking and power supply receptivity; co-ordination of harmonic behaviour. This standard deals with the definition and quality requirements of the power supply at the interface between traction unit and fixed installations. The standard specifies the interface between rolling stock and electrical fixed installations for traction, in the frame ”supply system“. The interaction between pantograph and overhead line and the interaction with subsystem “control-command” (especially signalling) are not dealt with in the standard. Requirements are given for the following categories of line: high speed lines, conventional lines. For classical lines, values, if any, are given for the existing European networks. A set of values is also specified for the future network, which is named ”target“ network. The following electric traction systems are concerned: railways; guided mass transport systems that are integrated with the railways; material transport systems that are integrated with the railways. This standard does not apply retrospectively to rolling stock already accepted by infrastructure managers. However, on new infrastructure, existing rolling stock may be accepted by the infrastructure manager, provided there is an agreement. Information is given to the train operating companies on electrification parameters to enable them to confirm after consultation with the rolling stock manufacturers that there will be no consequential disturbance on the electrification system.

Contents:

  • FOREWORD
  • Scope
  • 10 Harmonics and dynamic effects
  • 10.1 General
  • 10.2 Acceptance procedure for new elements
  • 10.3 Compatibility study
  • 10.4 Methodology and acceptance criteria
  • 11 Coordination of protection
  • 11.1 General
  • 11.2 Protection toward short-circuits
  • 11.3 Coordination of the circuit breakers on loss of line voltage and re-
  • 11.4 D.C. electrification systems: transient current during closure
  • 11.5 Acceptance criteria
  • 12 Regenerative braking
  • 12.1 General conditions on the use of regenerative braking
  • 12.1.1 Traction unit conditions
  • 12.1.2 Power supply system conditions
  • 12.2 Acceptance criteria
  • 13 Tests
  • 14 Test methodology
  • 14.1 Neutral sections
  • 14.1.1 Tests for traction unit

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 62313-2009 PDF

IEC 62313-2009 PDF

$186.00 $371.99