Commissioning of electrical, instrumentation and control systems in the process industry – Specific phases and milestones

Introduction: There is an increasing trend in the process industry to award the construction of whole plants to contractors on a lump-sum turnkey or similar commercial basis. Experience has shown that both the process industry (hereinafter called “the owner”) and the contractor have long and expensive discussions to lay down unambiguously the scope of activities to be taken by the contractor and the owner and their responsibilities to achieve the handover of the plant. This standard is intended to lead to an improvement and acceleration of the negotiation phase and to a mutual understanding about the scope of the activities of each party.

Scope: This International Standard defines specific phases and milestones (see Figure 1) in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the “completion-of-erection” milestone of the project and prior to the “acceptance-of-the-plant” phase by the owner. Such activities need to be adapted for each type of process/plant concerned. NOTE This standard assumes that the “acceptance-of-the-plant” milestone will occur after the performance test. If there is a reduced scope, this document should be adapted accordingly. Acceptance of plant PHASES Construction Precommissioning Commissioning Production Cold Hot MILESTONES Completion of erection Mechanical completion Start-up Start of production Performance test NOTE Construction and precommissioning activities could be overlapping. Figure 1 – Definition of phases and milestones For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003).

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope