Automation systems in the process industry – Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
Introduction: There is an increasing trend in the process industry to shorten the time period for project execution. At the same time, the complexity of automation systems is being increased due to the number of connected systems and the use of new technologies, for example, wired and wireless field sensor networks. Experience has shown that the owner, the buyer and the vendor have long and extensive discussions to unambiguously establish the scope of activities and responsibilities in order to achieve timely delivery and acceptance of automation systems. This document provides requirements and guidance on acceptance testing of control system installations, which can lead to a mutual understanding about the scope of activities of each party.
Scope: 1.1 General applicability This International Standard defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification. This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system. 1.2 Exclusions 1.2.1 Prior- and post-test activities Engineering and manufacturing activities prior to or after the FAT, FIT, SAT and SIT, such as loop checks and commissioning, are not covered by this document. 1.2.2 Regulated industries For applications in the pharmaceutical or other highly specialized industries, additional guidelines (for example, good automated manufacturing practice (GAMP)), definitions and stipulations apply in accordance with other applicable existing standards. 1.2.3 Safety instrumented systems The user can utilize this document to develop necessary testing for basic checks of a safety system, however, this document does not cover validation of a safety system. IEC 61511 provides requirements for checks and validation of safety instrumented systems. 1.2.4 Manufacturing execution systems Testing and verification of manufacturing execution systems (MES) is not covered by this document. 1.2.5 Advanced process control Testing and verification of advanced process control (APC) is not covered by this document. 1.2.6 Security for industrial automation and control systems Although this document includes a limited number of network checks, it does not cover complete network and system securit
Contents:
- FOREWORD
- INTRODUCTION
- Scope