Rules for steam turbine thermal acceptance tests – Part 3: Thermal performance verification tests of retrofitted steam turbines
Introduction: Retrofitting steam turbines in an existing power plant frequently involves an improvement of performance. IEC 60953-0, which defines the rules for steam turbine thermal acceptance tests in power plants, does not cater for all the requirements specific to retrofit projects. It has, therefore, been deemed necessary to draw up a Supplementary Standard (this document) for guidance on the thermal acceptance tests of retrofitted steam turbines. However, a large number of the provisions and recommendations of IEC 60953-0 are still applicable to retrofits and, therefore, in order to avoid a repetitive and bulky document, only the retrofit-specific addenda will be found in this document. Although this document is intended to apply to the retrofit of large condensing steam turbines, it can nevertheless be used for other types and sizes of turbines to define the basis of a specific procedure to be agreed upon by the parties involved. The rules given in this document cover all hardware change in the steam turbine equipment. Changes to other hardware components (e.g. boiler, feedwater heaters, etc.) are not covered by this document, although these changes may affect the thermodynamic cycle. The purpose of this document is to cover the retrofit of steam turbine components which influence the efficiency of the power plant and are subject to a performance guarantee. Many different situations are likely to be encountered: for example, the replacement of steam valves, the replacement of part o
Scope: 1.1 General This part of IEC 60953 establishes a Supplementary Standard for thermal verification tests of retrofitted steam turbines. The rules given in this document follow the guidance given in IEC 60953-0, but contain amendments and supplements regarding guarantees and verification of the guarantees by thermal acceptance tests on retrofitted steam turbines. General principles for the preparation, performance, evaluation, comparison with guaranteed values and the determination of the measurement uncertainties of verification tests are given in this document. This document is applicable only when the retrofit involves some hardware change in the steam turbine equipment. Conversely, any modification on the cycle or any retrofit of other equipment of the power plant (e.g. boiler, feedwater heaters, etc.) is not covered by this document. 1.2 Object The purpose of this document is to establish appropriate guaranteed parameters, to verify these guarantees and to determine measurement uncertainty. The guarantees with their provisions should be formulated completely and without contradiction (see 3.4 of IEC 60953-0:2022 and 3.5 of this document). The verification tests may also include such measurements as are necessary for corrections according to the conditions of the guarantee and checking of the results. 1.3 Matters to be considered in the contract Subclause 1.3 of IEC 60953-0:2022 applies.
Contents:
- FOREWORD
- INTRODUCTION
- Scope