IEC 61557-7 (REDLINE + STANDARD)-2019 PDF

IEC 61557-7 (REDLINE + STANDARD)-2019 PDF

Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c.-Equipment for testing, measuring or monitoring of protective measures-Part 7: Phase sequence

$85.75 $171.50 -50%
Product Code: IEC 61557-7 (REDLINE + STANDARD)
Stock In Stock
Edition: 3.0
Published: 07/2019
Number of Pages: 48
File Size: 1 file

Available Options

Product Description

Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures – Part 7: Phase sequence

Scope: This part of IEC 61557 specifies the requirements for applicable to measuring equipment applied to for testing the phase sequence in three-phase distribution systems. Indication of the phase sequence may can be mechanical, visual and/or audible. This part of IEC 61557 does not apply to ancillary measuring equipment for other quantities, for example voltage testers comprising an additional phase sequence indicator. This document does not apply to additional measurements for other quantities. It does not apply to monitoring relays. NOTE Phase lamps are not considered to be voltage testers. Common worldwide three-phase distribution systems are depicted in IEC 610101.

Contents:

  • FOREWORD
  • Scope

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 61557-7 (REDLINE + STANDARD)-2019 PDF

IEC 61557-7 (REDLINE + STANDARD)-2019 PDF

$85.75 $171.50