Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
Introduction: Hydro plant owners make significant investments annually in rehabilitating plant equipment (turbines, generators, transformers, penstocks, gates etc.) and structures in order to improve the level of service to their customers and to optimize their revenue. In the absence of guidelines, owners may be spending needlessly, or may be taking unnecessary risks and thereby achieving results that are less than optimal. This document is intended to be a tool in the optimisation and decision process. Edition 1 of this International Standard was based on the IEA document Guidelines on Methodology for Hydroelectric Francis Turbine Upgrading by Runner Replacement.
Scope: This document covers turbines, storage pumps and pump-turbines of all sizes and of the following types: Francis; Kaplan; propeller; Pelton (turbines only); bulb turbines. This document also identifies without detailed discussion, other powerhouse equipment that could affect or be affected by a turbine, storage pump, or pump-turbine rehabilitation. The object of this document is to assist in identifying, evaluating and executing rehabilitation and performance improvement projects for hydraulic turbines, storage pumps and pump- turbines. This document can be used by owners, consultants, and suppliers to define: needs and economics for rehabilitation and performance improvement; scope of work; specifications; evaluation of results. This document is intended to be: an aid in the decision process; an extensive source of information on rehabilitation; an identification of the key milestones in the rehabilitation process; an identification of the points to be addressed in the decision processes. This document is not intended to be a detailed engineering manual nor a maintenance document.
Contents:
- FOREWORD
- INTRODUCTION
- Scope