IEC 63409-3-2025 PDF

IEC 63409-3-2025 PDF

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 3: Basic operations

$239.59 $479.18 -50%
Product Code: IEC 63409-3
Stock In Stock
Edition: 1.0
Published: 12/2025
Number of Pages: 144
File Size: 1 file

Available Options

Product Description

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 3: Basic operations

Introduction: This document gives test procedures for confirming the basic operation characteristics of power conversion equipment (PCE). Part 3 confirms basic power conversion control of PCE at steady state condition and at transient response. Figure 1 shows the relationships of the seven parts in the IEC 63409 series. Part 3 is focused on the control functions in PCE with respect to power conversion. Power flow control and grid support functions will generate active and reactive power commands according to the grid conditions. The commands are sent to power conversion control, and power conversion control will make current or voltage references, which manipulate signals for the switching devices. It is important to confirm the basic control performance of the PCE as power conversion equipment without power flow control and grid support functions, so that additional functions such as power flow control and grid support functions can perform appropriately. The responses of PCE against abnormal grid conditions will be covered in Part 4 (IEC 63409-4). Power quality of the PCE output will be covered in Part 5 (IEC 63409-5). Power flow control and grid support functions will be covered in Part 6 (IEC 63409-6). Responses against commands through communication will be covered Part 7 (IEC 63409-7). Figure 1 – Scopes of IEC 63409 series

Scope: This document specifies test procedures for confirming the basic operational characteristics of power conversion equipment (PCE) for use in photovoltaic (PV) power systems with or without energy storage. The basic operational characteristics are the capability of the PCE before any limitations due to internal settings are applied to the PCE to meet specific grid support functions or specific behaviours against abnormal changes. This document covers the testing of the following items: a) Steady state characteristics Test procedures to confirm operable range of PCE at steady state condition are described. The operable ranges in apparent power, active power, reactive power, power factor, grid voltage and grid frequency are confirmed according to the test procedures. b) Transient-response characteristics Test procedures to confirm PCE’s response against a change of operational condition are described. Transient-response characteristics to be confirmed are response behaviours against: Active power set point change and reactive power set point change Grid voltage change, phase angle change, voltage unbalance and frequency change This document only considers the changes within normal (continuous) operable ranges. Therefore, the behaviours against abnormal changes and grid support functions are out of the scope and are covered in other parts of this series.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC 63409-3-2025 PDF

IEC 63409-3-2025 PDF

$239.59 $479.18