Photovoltaic power systems (PVPSs) – Roadmap for robust reliability
Introduction: Reliability of a PVPS or its components is perceived in many ways depending on the perspective of the observer. This document addresses many of these perspectives ranging from component failures to the human factors needed in operations and maintenance (O&M) of a PVPS. Technically, reliability is the probability that a product or a system will perform its intended functions satisfactorily without failure and within specified performance limits for a specified length of time, operating under specified environmental and operational conditions. Stated as such, reliability analysis is a physics problem in that it includes what, how, and why of failure. Reliability is determined by a variety of factors (failure modes) and each failure mode is generally characterized as an average or mean time to or between failure or by failure rates (commonly failures per unit of time) or by failure distributions. Causes include failure mechanisms such as overstress and below specification strength, natural and induced environmental exposures, chemical aging, radiation, and other factors such as weak or intermittent manufacturing quality or shipping and handling induced damage that lead to a component failure. The failed items will need repair or replacement through a function of maintenance actions. Reliability analysis and best practices should be applied throughout the concept and design phases to identify, pre-empt, prevent, forestall, or mitigate such failures during planned operation. Cogni
Scope: PVPS component and system reliability engineering works to define the PVPS probability of making the indicated value such as energy or revenue, also at a given statistical confidence level for an estimate. This needs to be assessed properly as an accurate levelized cost of energy (LCOE) results from identifying and acting on a set of quantifiable metrics based upon real measured data of actual plants under the widest variety of real site conditions. In many instances, the use of P numbers (which stands for "percentile") may not be clearly understood and as a result, inappropriate conclusions drawn which have a financial result. P values are used to establish the confidence that one can require to provide the assurance that the item will meet specification. A P50 value, for example, provides that there is a 50 % confidence in the value used in reliability predictions. This value of confidence translates to the median of the population or in other words, it is equivalent to a coin toss on whether the value is valid. It is better to have a higher confidence that the system will work to specification. For reliability metrics, this is typically defined as being a P90 or P95 values. This level of confidence significantly characterizes financial and technical risk plant availability. The failure rates and mode become important for predicting future failures. In a worst case, significant wear out failures may be indicative of serial failures and attention is warranted. A needed caution is the components may have multiple failure modes and root cause analyses may be useful discerning the failure modes. The LCOE calculations may not adequately include all the relevant costs, i.e. all-in costs, and risks which create further uncertainty. That uncertainty has a high probability of coming to inaccurate conclusions and choices. Ideally, the owners, maintainers and operators should look for reliability issues early in the concept, system, and hardware and software design engineering efforts. Otherwise, the defects in software code and poor design or weak components will manifest themselves in a multitude of unexpected failures resulting in unwanted and unexpected risks and cos
Contents:
- FOREWORD
- INTRODUCTION
- Scope