IEC TS 60076-19-2013 PDF

IEC TS 60076-19-2013 PDF

Power transformers-Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors

$163.93 $327.86 -50%
Product Code: IEC TS 60076-19
Stock In Stock
Edition: 1.0
Published: 03/2013
Number of Pages: 80
File Size: 1 file, 612 Bytes

Available Options

Product Description

Power transformers – Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors

Introduction: The losses of the transformers (no- load and load losses) are object of guaranty and penalty in the majority of the contracts and play an important role in the evaluation of the total (service) costs and therefore in the investments involved. According to ISO/IEC 17025 the result of any measurement should be qualified with the evaluation of its uncertainty. A further requirement is that known corrections shall have been applied before evaluation of uncertainty. Corrections and uncertainties are also considered in IEC 60076-8 were some general indications are given for their determination. This Technical Specification deals with the measurement of the losses that from a measuring point of view consist of the estimate of a measurand and the evaluation of the uncertainty that affects the measurand itself. The uncertainty range depends on the quality of the test installation and measuring system, on the skill of the staff and on the intrinsic measurement difficulties presented by the tested objects. The submitted test results are to be considered the most correct estimate and therefore this value has to be accepted as it stands. In the annexes to this document, two examples of uncertainty calculations are reported for load loss measurements on large power and distribution transformers. Standards, technical reports and guides mentioned in the text are listed at the end of the document. It is stated that guaranty and penalty calculations should refer to the best estimated values of

Scope: This part of IEC 60076, which is a Technical Specification, illustrates the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers. Even if the attention is especially paid to the transformers, when applicable the specification can be also used for the measurements of reactor losses, except large reactors with very low power factor.

Contents:

  • FOREWORD
  • INTRODUCTION
  • Scope
  • 10 Estimate of corrections and uncertainty contributions
  • 10.1 Instrument transformers
  • 10.2 Uncertainty contributions of ratio error of instrument transformers
  • 10.3 Uncertainty contribution of phase displacement of instrument transformers
  • 10.3.1 General
  • 10.3.2 Complete reference procedure
  • 10.3.3 Class index procedure
  • 10.4 Voltage and current measurements
  • 10.5 Power meter
  • 10.6 Correction to sinusoidal waveform
  • 10.7 Winding temperature at load loss measurement
  • 10.8 Winding resistance measurement

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEC TS 60076-19-2013 PDF

IEC TS 60076-19-2013 PDF

$163.93 $327.86