Recommendations for renewable energy and hybrid systems for rural electrification – Part 4: System selection and design
Introduction: The IEC 62257 series intends to provide to different players involved in rural electrification projects (such as project implementers, project contractors, project supervisors, installers, etc.) documents for the setting up of renewable energy and hybrid systems with AC voltage below 1 000 V and DC voltage below 1 500 V. These documents are recommendations: to choose the right system for the right place; to design the system; to operate and maintain the system. These documents are focused only on rural electrification concentrating on but not specific to developing countries. They should not be considered as all inclusive to rural electrification. The documents try to promote the use of renewable energies in rural electrification; they do not deal with clean mechanisms developments at this time (CO2 emission, carbon credit, etc.). Further developments in this field could be introduced in future steps. This consistent set of documents is best considered as a whole with different parts corresponding to items for safety, sustainability of systems aiming at the lowest life cycle cost as possible. One of the main objectives is to provide the minimum sufficient requirements, relevant to the field of application that is: renewable energy and hybrid off-grid systems.
Scope: This part of IEC 62257 provides a method for describing the results to be achieved by the electrification system independently of the technical solutions that could be implemented. The purpose of this part of IEC 62257 is to provide a method to assist project contractors and project developers to select and design the electrification system for isolated sites while matching the identified needs, such as those described in IEC TS 62257-2. IEC TS 62257-2 assesses the needs of the users and the different power system architectures which can be used for meeting these needs. In relation to the needs of the different participants to the project, functional requirements that shall be achieved by the production and distribution subsystems are listed. In Clause 5, energy management rules to be considered are described. These are key issues as they have a great influence on the sizing of the electrification system. In Clause 6, the informations provided by the system sizing process to allow the participants to select the equipment or component able to fulfil the functional requirements are listed. To allow and facilitate the management of the micro-power plant and the maintenance of the whole electrification system, some information is collected and monitored. Clause 7 is dedicated to defining the parameters and specifying rules for data acquisition.
Contents:
- FOREWORD
- INTRODUCTION
- Scope