Nuclear power plants – Instrumentation and control systems, control rooms and electrical power systems – Specific features of small modular reactors and needs regarding standards
Introduction: a) Technical background, main issues and organisation of the Technical Report Prior the April 2019 Paris meeting, the need to develop a TR to define which orientations could be followed by IEC SC 45A to cover SMRs (Small Modular Reactors) was identified and the decision to develop the TR was taken during the meeting. A team of more than 30 IEC/SC 45A experts to the different SC 45A Working Groups was set up to cover the multi-disciplinary aspects of the subject. b) Situation of the current Technical Report in the structure of the IEC SC 45A standard series The technical report IEC TR 63335 is a fourth level IEC SC 45A document. This document draws roadmaps for the different SC 45A Working Groups to define orientations to cover SMRs. It is worthwhile noting that some of these orientations are also relevant for all NPPs. For more details on the structure of the IEC SC 45A standard series, see item d) of this introduction. c) Recommendations and limitations regarding the application of the Technical Report It is important to note that a technical report is entirely informative in nature. It gathers data collected from different origins and it establishes no requirements. d) Description of the structure of the IEC SC 45A standard series and relationships with other IEC documents and other bodies documents (IAEA, ISO) The top-level documents of the IEC SC 45A standard series are IEC 61513 and IEC 63046. IEC 61513 provides general requirements for I&C systems and equipment that are
Scope: This document identifies a number of issues of particular importance to light water Small Modular Reactors (SMRs), which are not currently adequately addressed by existing IEC SC 45A standards, and that could be considered when revising existing publications or that could be the object of new work item proposals. Whether each of these issues will indeed be addressed, and if so in which publication, will be the decision of each SC 45A working group. Though there are a number of advanced Generation IV SMR projects underway, their specific needs are not covered by this document. This document is organized as follows: Clause 5 presents the main features of SMRs that are not typically found in large reactors or that are of particular importance for SMRs, and that could require specific or additional requirements and recommendations over those already provided in IEC SC 45A standards. Clause 6 suggests, for each working group, a number of issues that could be considered in the revision of existing publications or as subjects for new work items. Clause 7 suggests topics of importance to SMRs but that do not fit in the current scope of existing working groups.
Contents:
- FOREWORD
- INTRODUCTION
- Scope