Terrestrial photovoltaic (PV) systems – Guidelines for effective quality assurance in PV systems installation, operation and maintenance
Introduction: It is frequently observed that problems with PV systems may be related to the system installation in one of multiple ways. Successful completion and continuous operation of PV systems depend on appropriate training of workers, appropriate oversight of their work, and a continual improvement system to learn from identified problems. In order to supplement multiple IEC standards for qualification of the components and to guide the design of systems, it is useful to have oversight of the installation process. Some installation companies use an ISO 9001 quality management system, but this is a relatively uncommon practice and those that do certify to ISO 9001 may omit some critical elements. Similarly, after completion of the installation, practices for operation and maintenance of a PV system vary widely with variable success. This document was created to identify critical technical elements that should be included in Quality Assurance programs and, where useful, to provide more specific management requirements than are found in ISO 9001. This document is designed to be implemented as a self-contained certification or in conjunction with ISO 9001.
Scope: This document provides the minimum activities deemed necessary to implement an effective Quality Assurance program for the managing and reducing of risk in the installation and operation of photovoltaic (PV) systems. This document defines requirements for certifying that an entity has and uses a Quality Assurance program to prevent, or reduce errors and learns from any new errors in: a) installation, and b) operation and maintenance of a PV system. The object of this document is to provide more confidence in the performance and reliability of certified PV systems. By being installed and operated under a Quality Assurance program in accordance with this document, PV systems are expected to operate as designed and as expected based on product warranties. This document is developed to facilitate implementation of the quality control scheme under the IECRE program, for those who choose to use the IECRE program ("IEC system for certification to standards relating to equipment for use in renewable energy applications"). NOTE This document has been written primarily to apply to large PV plants and similar schemes. Requirements for residential systems and smaller scale installers are being considered for a future version of this document. This document also assumes these requirements apply to the prime contractor who, in turn, is responsible to hold subcontractors and other service providers to the intent of these requirements. This document is applicable to all PV systems independent of design and technology, i.e. flat panel, Concentrator Photovoltaic (CPV). Quality controls for CPV and nonconventional flat-plate systems will differ somewhat from those of more conventional designs; this document has not considered these differences and is expected to be generally applicable to all PV systems. This document covers processes starting from the shipment of components out to the installation site and including the transport, unpacking, racking, construction, module installation process and processes associated with operation and maintenance of the PV system. Compliance to a Quality Management System (QMS) such as ISO 9001 will meet many requirements in this document. The re
Contents:
- FOREWORD
- INTRODUCTION
- Scope