Simulators used for testing of photovoltaic power conversion equipment – Recommendations – Part 2: DC power simulators
Introduction: The objective of this document is to establish terminology, create a framework for, and provide guidance regarding the electrical performance of DC power simulators used to test photovoltaic (PV) power conversion equipment (PCE) for compliance with grid interconnection or PV performance standards. Along with IEC TS 63106-1, it provides guidance for the selection or development of power simulators used within a test and evaluation system for PV PCEs. Testing laboratories are responsible for selecting the appropriate test items and procedures as well as defining the required performance for adequate evaluation of utility interactive PV PCEs, considering utility power requirements, local codes and regulations. It is intended for this document to be used in conjunction with parallel PCE standards developed for specific performance or grid-interaction requirements.
Scope: The purpose of this part of IEC TS 63106 is to provide recommendations for Low Voltage (LV) DC power simulators used for testing photovoltaic (PV) power conversion equipment (PCE) to utility interconnection or PV performance standards. NOTE Low Voltage refers to DC voltage 1 500 V and less. In this document, the term “DC power simulator” refers to any source that is used during testing to provide DC power to the Equipment Under Test (EUT). That includes, but is not limited to, PV array simulators designed to simulate the DC output I-V curve of a photovoltaic array operating in real-world conditions. This document primarily addresses DC power simulators used for testing of grid-interactive PCE, also referred to as grid-connected power converters (GCPCs). It also addresses some uses of DC power simulators for testing stand-alone and multi-mode PCEs. There are many types of tests that can be conducted by utilizing a DC power simulator. Certain tests require the use of a PV array or PV array simulator, such as measurements of the PCE’s PV input static and dynamic characteristics related to maximum power point tracking, while other tests may be appropriate to conduct with a static DC power supply. Test requirements and procedures are specified in IEC standards and local utility grid requirements, selected by the system integrator, PCE manufacturer, network operator, utility, or third-party inspector.
Contents:
- FOREWORD
- INTRODUCTION
- Scope