IEEE Recommended Practice for Thermal Cycle Testing of Form-Wound Stator Bars and Coils for Large Rotating Machines
Introduction: This introduction is not part of IEEE Std 1310-2012, IEEE Recommended Practice for Thermal Cycle Testing of Form- Wound Stator Bars and Coils for Large Rotating Machines. In some applications, large rotating machines are subjected to rapid transitions from low power to full power, and vice versa. For example, hydrogenerators (peaking duty and pumped storage), synchronous condensers, and gas turbine generators are often raised from idle to full power in a matter of minutes, are operated at full power for hours, and are then rapidly reduced to zero output. This load cycling leads to rapid temperature changes within the stator winding. As a result, an alternating shear stress develops within the ground insulation system. If the bond between the copper and the insulation is not adequate, the copper may separate from the insulation. This results in the formation of voids between the insulation and the copper that may permit relative movement of the copper strands/turns, leading to abrasion of the insulation. Also, voids can develop between the layers of the groundwall insulation as a result of delamination. In high-voltage bars/coils, these voids can lead to partial discharges, and, under certain circumstances, to puncture of the insulation. The test procedure described in this recommended practice is intended to simulate this thermal cyclic aging mechanism under controlled conditions. To give meaningful results in a reasonable time, acceleration is achieved by repeatedly applying
Contents:
- 1.1 Scope
- 1.2 Purpose
- 4.1 Test objects
- 4.2 Method of heating
- 4.3 Method of cooling
- 4.4 Temperature cycle and schedule
- 5.1 Quantity of bars/coils required for testing
- 5.2 Positioning and setting up bars/coils for test
- 5.3 Temperature criteria, measurement, and control
- 7.1 Electrical proof test for the groundwall insulation
- 7.2 Dissipation factor and tip-up measurements
- 7.3 Partial discharge measurements
- 7.4 Physical measurements
- 7.5 Tap test—mechanical delamination detection
- 7.6 Surface resistivity
- 8.1 Proof tests
- 8.2 Breakdown or voltage endurance test
- 8.3 Dissection