IEEE 1727-2013 PDF

IEEE 1727-2013 PDF

IEEE Guide for Working Procedures on Underground Transmission Circuits with Induced Voltage

$59.50 $119.00 -50%
isbn 9780738183954
Product Code: IEEE 1727
Stock In Stock
Published: 05/20/2013
Number of Pages: 57
File Size: 1 file, 2 MB

Available Options

Product Description

IEEE Guide for Working Procedures on Underground Transmission Circuits with Induced Voltage

Introduction: This introduction is not part of IEEE Std 1727-2013, IEEE Guide for Working Procedures on Underground Transmission Circuits with Induced Voltage. As the need for greater power capacity increased the locations where overhead transmission lines could be built to deliver this power to the users were restricted or eliminated by surrounding communities. This resulted in increasing numbers of underground transmission circuits. As the need for additional capacity continued, the instances of parallel transmission circuits also increased due to the limited locations available for construction of new underground transmission lines. Typically while performing operations and maintenance tasks on an existing line, parallel lines would remain energized. Utilities became aware of the problem of induced voltages in the situation where the parallel lines were very close. Because there were no industry guidelines or standards for these situations a utility conducted surveys of their peers to determine what others were doing. These surveys resulted in the recognition of the need for a standardized approach to this problem. A working group was formed to address this need. This guide addresses this lack of standards by detailing working procedures that when used, help to ensure a safer working environment for workers performing tasks where induced voltages are present from parallel underground transmission lines in a common duct bank.

Contents:

  • 1.1 Scope
  • 1.2 Purpose
  • 3.1 Definitions
  • 3.2 Acronyms and abbreviations
  • 4.1 Safety
  • 4.2 Safe voltage
  • 4.3 Warnings
  • 4.4 Grounding
  • 4.5 Grounding methods
  • 4.6 Grounding methodologies
  • 5.1 Equipotentiality
  • 5.2 Setting up Equipotentiality
  • 5.3 Personal protection measures for operators
  • 5.4 Prior to work
  • 6.1 Cable pulling
  • 6.2 Jointing
  • 6.3 Terminating
  • 6.4 Outdoor termination procedure
  • 7.1 General
  • 7.2 Different scenarios
  • 7.3 Building a new line close to an existing line
  • 7.4 Adding a length of line and two joints in an existing line close to another existing line

Be the first to write a review for this product.