IEEE 1862-2014 PDF

IEEE 1862-2014 PDF

IEEE Recommended Practice for Overvoltage and Insulation Coordination of Transmission Systems at 1000 kV AC and Above

$59.50 $119.00 -50%
isbn 9780738191577
Product Code: IEEE 1862
Stock In Stock
Published: 07/18/2014
Number of Pages: 60
File Size: 1 file, 3.6 MB

Available Options

Product Description

IEEE Recommended Practice for Overvoltage and Insulation Coordination of Transmission Systems at 1000 kV AC and Above

Introduction: This introduction is not part of IEEE Std 1862-2014, IEEE Recommended Practice for Overvoltage and Insulation Coordination of Transmission Systems at 1000 kV AC and Above. In order to resolve the prominent problem of the inverse distribution between energy resources and power demands, the ultra-high voltage (UHV) ac transmission, which is advantaged over long distance and large capacity, is required. There are specifics on overvoltage and insulation coordination of UHV ac systems, such as switching overvoltages (SOV), very fast front overvoltage (VFFO), lightning overvoltage, etc. Time-to-crest of SOV on UHV lines is much longer than that of standard switching impulse (SI). For air clearance of UHV transmission lines, the switching impulse flashover voltage is non-linearly related to the distance of the clearance. Flashover voltage presents its saturation feature as clearance increase. In order to improve the economy of an UHV transmission line, air clearance test data of longer time-to-crest SI can be used for insulation coordination. In UHV ac systems, the ratio of the basic lightning impulse insulation level (BIL) to the system voltage is lower than that of EHV system, so VFFO may become the main dielectric stress to be limited. Since UHV towers are higher than EHV ones, lightning overvoltage in UHV systems needs special attention. Copyright © 2014 IEEE. All rights reserved.

Contents:

  • 1.1 Scope
  • 1.2 Purpose
  • 3.1 Definitions
  • 3.2 Acronyms and abbreviations
  • 4.1 Temporary overvoltages
  • 4.2 Switching overvoltages
  • 4.3 Lightning overvoltages
  • 4.4 Very fast front overvoltages (VFFO)
  • 7.1 Design procedures for continuous power frequency voltage and temporary overvoltages
  • 7.2 Design procedures for switching overvoltages
  • 7.3 Design procedures for lightning overvoltages
  • 7.4 Design procedures for very fast front overvoltages
  • 7.5 Final selection

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEEE 1862-2014 PDF

IEEE 1862-2014 PDF

$59.50 $119.00