IEEE 1095-2012 PDF

IEEE 1095-2012 PDF

IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications

$85.00 $170.00 -50%
isbn 9781504414159
Product Code: IEEE 1095
Stock In Stock
Published: 06/20/2012
Number of Pages: 52
File Size: 1 file, 660 KB

Available Options

Product Description

IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications

Introduction: This introduction is not part of IEEE Std 1095-2012, IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications. Large hydraulic turbine-driven generators are shipped as components and completely assembled and installed at the site. The installation, therefore, becomes a continuation of the manufacturing process, and many of the operations involved are those that are normally performed in the factory on smaller generators. Close tolerances must be maintained in the fit and alignment of the various parts. The use of proper installation procedures is essential to achieve satisfactory operation of the unit. This guide, originally intended for new construction, continued to be useful whenever the generator rotor or turbine is reinstalled in its operating placement, following removal for maintenance or repair. This guide incorporates much of the information previously found in the National Electrical Manufacturers Association (NEMA) publication MG 5.2, Installation of Vertical Hydraulic-Turbine-Driven Generators and Reversible Generator/Motors for Pumped Storage Installations. MG 5.2 was originally issued in 1972 and revised in 1975 and 1977. NEMA sponsorship was withdrawn and MG 5.2 was rescinded in September, 1982. The Hydroelectric Power Subcommittee felt that this guide continued to provide usefulness to the hydropower industry and in 1985 decided to undertake the maintenance of this guide for the benefit of the body of users. In

Contents:

  • 1.1 Scope
  • 1.2 Purpose
  • 3.1 General
  • 3.2 Erection contractor-supplied tools
  • 3.3 Manufacturer-supplied tools
  • 3.4 Customer-supplied materials, services, and facilities
  • 5.1 General arrangement
  • 5.2 Stator construction
  • 5.3 Rotor construction
  • 5.4 Shaft and coupling
  • 5.5 Thrust bearing
  • 5.6 Guide bearings
  • 5.7 Brakes and jacks
  • 5.8 Field assembly requirements
  • 6.1 Factory preassembly and alignment
  • 6.2 Field alignment
  • 7.1 Position references
  • 7.2 Handling of generator parts
  • 7.3 Matching of parts
  • 7.4 Use of plumb lines
  • 7.5 Precautions in welding
  • 7.6 Cleanliness
  • 7.7 Record keeping
  • 8.1 Receiving
  • 8.2 Storing
  • 8.3 Unpacking
  • 9.1 General
  • 9.2 Generator shipped completely assembled
  • 9.3 Generator assembled in the field, thrust bearing above the rotor, spring type or self-equalizing
  • 9.4 Generator assembled in the field, thrust bearing above the rotor, adjustable-shoe type

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEEE 1095-2012 PDF

IEEE 1095-2012 PDF

$85.00 $170.00