IEEE 1215-2013 PDF

IEEE 1215-2013 PDF

IEEE Guide for the Application of Separable Insulated Connectors

$43.50 $87.00 -50%
isbn 9780738187785
Product Code: IEEE 1215
Stock In Stock
Published: 07/12/2013
Number of Pages: 49
File Size: 1 file, 850 KB

Available Options

Product Description

IEEE Guide for the Application of Separable Insulated Connectors

Introduction: This introduction is not part of IEEE Std 1215-2013, IEEE Guide for the Application of Separable Insulated Connectors. This guide is intended as a supplement to the training in high-voltage electrical equipment, established safe operating procedures, and the manufacturer’s instructions for the application of separable insulated connectors. Installers and operators of separable connectors require formal training in the use of high- voltage electrical equipment. It is the users’ responsibility to establish safe operating procedures and provide training. The manufacturers are required to provide installation and operating instructions for their products. This document is the first revision to the original IEEE guide issued that addresses the application and operation of separable insulated connectors. This application guide is the product of close collaboration between representatives of both users and manufacturers of separable connectors. The separable connector working group of the Insulated Connector Committee provided valuable input to this guide. This application guide is intended to be used in concert with IEEE Std 386, IEE Standard for Separable Insulated Connector Systems for Power Distribution Systems Above 600 V. IEEE Std 386 defines the ratings, construction specifications, service conditions, and qualification tests for separable insulated connectors. IMPORTANT NOTICE: This guide provides only general information on the application and operation of separable insulat

Contents:

  • 1.1 Scope
  • 3.1 Parts of a 200 A bushing
  • 3.2 Parts of a bushing well
  • 3.3 Parts of an elbow
  • 3.4 Separable connectors
  • 3.5 Tools
  • 3.6 General
  • 4.1 Systems
  • 4.2 Environmental
  • 5.1 Use of loadbreak versus deadbreak
  • 5.2 Grounding of components and shields
  • 5.3 Lubrication
  • 5.4 Tightening requirements
  • 5.5 Elbow / bushing assembly
  • 5.6 Compression lugs
  • 5.7 Solvents
  • 5.8 Cleanliness (avoiding contamination)
  • 5.9 Cable training
  • 5.10 Clearances for operation
  • 5.11 Operator/bushing location
  • 5.12 Stacking 600 A and 900 A Elbows
  • 6.1 Use of 200 A loadbreak versus 200 A deadbreak
  • 6.2 Capacitive test point
  • 6.3 Deadbreak operating practices
  • 6.4 Loadbreak operating practices
  • 6.5 Switching
  • 6.6 Fault duty
  • 6.7 Use of accessories
  • 6.8 Grounding accessories
  • 6.9 Inspection of separable connectors

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEEE 1215-2013 PDF

IEEE 1215-2013 PDF

$43.50 $87.00