IEEE 1793-2012 PDF

IEEE 1793-2012 PDF

IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines

$43.50 $87.00 -50%
isbn 9780738181141
Product Code: IEEE 1793
Stock In Stock
Published: 01/08/2013
Number of Pages: 40
File Size: 1 file, 510 KB

Available Options

Product Description

IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines

Introduction: This introduction is not part of IEEE Std 1793-2012, IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines. It is sometimes necessary to incorporate an underground cable segment into an overhead transmission line. An underground segment may be needed in areas where it is impractical to obtain overhead right-of-way, to avoid environmentally sensitive areas, to cross obstacles such as rivers or major highways, to cross airport runway safety zones, or to permit other land uses that would not be feasible with overhead lines. When an underground segment is added to an overhead transmission line, a transition facility is required. The transition facility provides a means to terminate the overhead transmission line, terminate the underground cable, connect the overhead and underground segments, and accommodate any ancillary systems associated with the underground cable. Underground cables have electrical and operating characteristics which are different from those of overhead lines, and which can affect the design of transition facilities. Underground transitions facilities are needed for short underground sections (“dips”), which might be measured in the hundreds to thousands of meters. Transition facilities are also required for longer underground segments, which can be several kilometers in length. The length of the underground segment can affect the transition facility design. Overhead to underground transition facilities

Contents:

  • 1.1 Scope
  • 1.2 Purpose
  • 3.1 Site selection
  • 3.2 System impacts
  • 4.1 Monopole structure layout/design
  • 4.2 Transition site design
  • 4.3 Other design considerations
  • 4.4 Structure installation
  • 4.5 Cable installation
  • 4.6 Accessories installation
  • 4.7 Commissioning
  • 4.8 Operational/Maintenance (O&M) considerations

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEEE 1793-2012 PDF

IEEE 1793-2012 PDF

$43.50 $87.00