IEEE Guide for On-Site Acceptance Tests of Electrical Equipment and System Commissioning of 1000 kV AC and Above
Introduction: This introduction is not part of IEEE Std 1861™-2014, IEEE Guide for On-Site Acceptance Tests of Electrical Equipment and System Commissioning of 1000 kV AC and Above. With the increase in voltage levels, the reliability and safety of high-voltage electric equipment is facing new challenges. There is a need to have consensus on a series of technical criteria and requirements for on- site acceptance tests for ultra-high-voltage (UHV) electric equipment to detect the damages or abnormal conditions that may occur during the transportation and installation processes and to determine whether equipment can be put into operation reliably and safely for power systems. AC transmission systems of 1000 kV or greater have been established and operated with full-voltage in China and are also currently in various stages of development in other countries. However, there is a lack of suitable UHV transmission system commissioning procedures and technical information. Therefore, it is necessary to formulate a series of consensus technical requirements and criteria so as to facilitate the development of UHV systems and help ensure their successful commissioning. This guide proposes on-site acceptance tests, relevant test items, test methods, and evaluation criteria for power transformers, reactors, capacitive voltage transformers (CVTs), bushing-type current transformers (CTs), gas-insulated switchgear, air-insulated grounding switches, air-insulated disconnecting switches, bushings, metal-oxi
Contents:
- 1.1 Scope
- 1.2 Purpose
- 3.1 Definitions
- 3.2 Acronyms and abbreviations
- 4.1 General
- 4.2 Power transformers
- 4.3 Reactors
- 4.4 Capacitive voltage transformers (CVTs)
- 4.5 Bushing-type CTs
- 4.6 Gas-insulated switchgear
- 4.7 Air-insulated grounding switches
- 4.8 Air-insulated disconnecting switches
- 4.9 Bushings
- 4.10 MOSAs
- 4.11 Suspension insulators and post insulators
- 4.12 Insulating oil
- 5.1 General
- 5.2 System commissioning items