IEEE Recommended Practice for Determining the Reliability of 7x24 Continuous Power Systems in Industrial and Commercial Facilities
Introduction: This introduction is not part of IEEE Std 3006.7-2013, IEEE Recommended Practice for Determining the Reliability of 7x24 Continuous Power Systems in Industrial and Commercial Facilities. IEEE 3000 Standards CollectionTM This recommended practice was developed by the Technical Books Coordinating Committee of the Industrial and Commercial Power Systems Department of the Industry Applications Society as part of a project to repackage the popular IEEE Color Books®. The goal of this project is to speed up the revision process, eliminate duplicate material, and facilitate use of modern publishing and distribution technologies. When this project is completed, the technical material in the thirteen IEEE Color Books will be included in a series of new standards—the most significant of which will be a new standard, IEEE Std 3000TM, IEEE Recommended Practice for the Engineering of Industrial and Commercial Power Systems. The new standard will cover the fundamentals of planning, design, analysis, construction, installation, startup, operation, and maintenance of electrical systems in industrial and commercial facilities. Approximately 60 additional dot standards, organized into the following categories, will provide in-depth treatment of many of the topics introduced by IEEE Std 3000TM: Power Systems Design (3001 series) Power Systems Analysis (3002 series) Power Systems Grounding (3003 series) Protection and Coordination (3004 series) Emergency, Standby Power, and Energy Management Syst
Contents:
- 1.1 Scope
- 3.1 Definitions
- 3.2 Acronyms and abbreviations
- 4.1 Special terminology for 7×24 facilities
- 4.2 Special electrical equipment to support continuous operation
- 4.3 Special mechanical equipment to support continuous operation
- 5.1 Failure of components
- 5.2 Failure of the subsystem
- 5.3 Failure of the critical electrical distribution system
- 5.4 Failure of the critical mechanical cooling system
- 5.5 Failure of the electrical power to the critical mechanical cooling system
- 5.6 Other types of failure
- 6.1 Reliability and availability—importance of using both
- 6.2 Reliability and availability as tools in design evaluation vs. evaluation of a specific facility
- 6.3 Recommended reliability tools for evaluation of 7×24 facilities
- 7.1 Common configurations of the UPS system
- 7.2 Critical electrical distribution system designs
- 7.3 Eliminating all single points of failure
- 7.4 Using STSs and dual cord equipment—cable and load management
- 8.1 Impact of redundancy on reliability calculations
- 8.2 Impact of facility size on reliability calculations
- 8.3 Operational availability vs. inherent availability
- 9.1 Cooling equipment commonly used
- 9.2 Common configurations of the mechanical cooling system
- 9.3 Reliability of the critical mechanical cooling system designs
- 9.4 Electrical power to the critical mechanical cooling system
- 9.5 Reliability of the electrical power to critical mechanical cooling system
- 9.6 Controls for critical mechanical cooling system
- 10.1 Commissioning of 7×24 continuous power systems
- 10.2 Operations of 7×24 continuous power systems