IEEE C37.122.1-2014 PDF

IEEE C37.122.1-2014 PDF

IEEE Guide for Gas-Insulated Substations Rated Above 52 kV

$76.50 $153.00 -50%
isbn 9780738196831
Product Code: IEEE C37.122.1
Stock In Stock
Published: 12/05/2014
Number of Pages: 75
File Size: 1 file, 6.3 MB

Available Options

Product Description

IEEE Guide for Gas-Insulated Substations Rated Above 52 kV

Introduction: This introduction is not part of IEEE Std C37.122.1™-2014, IEEE Guide for Gas-Insulated Substations Rated Above 52 kV. IEEE Std C37.122™-1983 was initiated in the early 1970’s when the first gas-insulated substations (GISs) were introduced. The reliability of GISs has improved greatly since the first installations. Utilities have taken advantage of the greater flexibility offered by GISs to locate substations closer to load centers with considerable savings in transmission system costs and reduced system loses. In addition, a GIS typically offers 20 years or more of operation before major overhaul is required. During the Working Group and Subcommittee deliberations on the 1993 revision, it was recognized that users would be better served if the original document was divided in two, becoming IEEE Std C37.122™ a (a standard) and IEEE Std C37.122.1™ (a guide). The two documents can be referred to individually or jointly depending on the purpose. This is the guide’s first major revision since it was published. This is a general update based on the latest technology and user experience. The subcommittee would like to acknowledge CIGRE for allowing the use of sections of CIGRE 125 [B12]b for this guide. The subcommittee would like thank the International Electrotechnical Commission (IEC) for permission to reproduce Information from its International Publication IEC 62271-203 ed.2.0. All such extracts are copyright of IEC, Geneva, Switzerland. All rights reserved. Further informatio

Contents:

  • 3.1 Definitions
  • 3.2 Abbreviations and acronyms
  • 4.1 GIS arrangement
  • 4.2 Benefits and drawbacks of a GIS
  • 4.3 Primary components
  • 4.4 Design, installation, and equipment handling
  • 4.5 Control wiring
  • 4.6 Local control cabinet (LCC)
  • 4.7 Gas handling
  • 4.8 Partitions
  • 4.9 Switch viewports and viewing options
  • 4.10 GIS grounding
  • 4.11 GIS seismic requirements
  • 4.12 Partial discharge (PD) testing
  • 4.13 Field testing
  • 4.14 Maintenance and repair
  • 4.15 GIS and the environment
  • 4.16 Future GIS extension considerations
  • 4.17 Thermal overload capability requirements of circuit breakers and remaining GIS equipment
  • 4.18 Special transient-recovery voltage (TRV) issues for faults in three-phase enclosures

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
IEEE C37.122.1-2014 PDF

IEEE C37.122.1-2014 PDF

$76.50 $153.00