Specification and qualification of welding procedures for production welding of steel and nickel-base castings
Introduction: All welding procedure qualifications for production welding of steel castings are intended to be in accordance with this document. All new welding procedure tests are to be carried out in accordance with this document from the date of its issue. However, this document does not invalidate previous welding procedure tests made to former national standards or specifications, such as ASME Section IX[1] or to previous editions of this document. Previous procedure qualifications that conform to the range of qualification of Clause 8 are valid under this document. Where additional tests have to be carried out to complete the qualification, it is only necessary to perform the additional tests to the requirements of Clauses 6 and 7. In the case of specific service, material or manufacturing conditions, tests more comprehensive than those specified by this document can be specified by the purchaser, in order to gain more information, e.g. longitudinal weld tensile tests, bend tests, chemical analyses, ferrite determination in austenitic stainless steels, elongation after fracture, Charpy V-notch impact tests, and radiographic tests. © ISO 2025 – All rights reserved
Scope: This document specifies how a welding procedure specification (WPS) for production welding of steel castings is qualified. Tests are intended to be carried out in accordance with this document, unless additional tests are specified by the purchaser or by agreement between the contracting parties. This document defines the conditions for the execution of welding procedure qualification tests and the limits of validity of a qualified welding procedure for all practical welding operations within the range of essential variables. This document applies to the arc welding of steel castings. The principles of this document can be applied to other fusion welding processes subject to agreement between the contracting parties.