Systèmes de Gestion Technique du Bâtiment (SGTB) - Partie 1: Spécifications et mise en oeuvre d’un projet
Introduction: The ISO 16484 series is aimed at the design of new buildings and the retrofitting of existing buildings for an acceptable indoor environment, practical energy conservation and efficiency. The ISO 16484 series is applicable to building automation and control systems (BACS), as follows: — The environmental design for all building types requires complex methods of automation and control. The functional integration of services other than heating, ventilating and air conditioning (HVAC) is a general task for all parties employed to develop an integrated multi-application system. The integration comprises, for example, lighting and electric power distribution control, security control, transportation, maintenance management or facilities management. This system integration allows the user to take advantage of synergies between the different applications. The ISO 16484 series gives guidance to architects, consultants and contractors as well as guidance to users on how to share such resources. — The innovation cycles between devices, systems and networks vary. In order to make it possible to add and to change existing devices and extend the building automation and control network, several interfaces, both proprietary and standardized, are defined between the BACS network and the other systems. A manufacturer can design a product, both to meet their specific marketing objectives and to give the option to integrate that special device into a multi-application BACS. Interfaces are also
Scope: This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS). This document specifies the phases required for the BACS project, including — design (determination of project requirements and production of design documents including technical specifications), — engineering (detailed function and hardware design), — installation (installing and commissioning of the BACS), and — completion (handover, acceptance and project finalization). This document also specifies the requirements for as-built documentation and training. This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.