ISO 17666-2025 PDF

ISO 17666-2025 PDF

Space systems-Programme management-Risk management

$60.00 $120.00 -50%
Product Code: ISO 17666
Stock In Stock
Edition: 3.
Published: 04/2025
Number of Pages: 28
File Size: 1 file, 2 Bytes

Available Options

Product Description

Systèmes spatiaux - Management des risques

Introduction: Risks are a threat to the project success because they have negative effects on the project cost, schedule and technical performance; but appropriate practices of controlling risks can present new opportunities with positive impact. The objective of project risk management is to identify, assess, reduce, accept, and control space project risks in a systematic, proactive, comprehensive, and cost-effective manner, taking into account the project’s technical and programmatic constraints. Risk is considered tradable against the conventional known project resources within the management, programmatic (e.g. cost, schedule) and technical (e.g. mass, power, dependability, safety) domains. The overall risk management in a project is an iterative process throughout the project life cycle, with iterations being determined by the project progress through the different project phases, and by changes to a given project baseline influencing project resources. Risk management is implemented at each level of the customer-supplier network. The risk management process requires information exchange among all project domains and provides visibility over risks, with a ranking according to their criticality for the project; these risks are monitored and controlled according to the rules defined for the domains to which they belong. When viewed from the perspective of a specific programme or project context, the requirements defined in this document are tailored to match the genuine requirements of

Scope: This document defines, extending the requirements of ISO 14300-1, the principles and requirements for integrated risk management on a space project. It explains what is needed to implement a project-integrated risk management policy by any project actor, at any level (i.e. customer, first-level supplier or lower-level suppliers). This document contains a summary of the general risk management process, which is subdivided into four basic steps and nine tasks. This document is applicable to all the space project phases, as defined in ISO 14300-1.

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ISO 17666-2025 PDF

ISO 17666-2025 PDF

$60.00 $120.00