Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 3: Information flows in production planning processes
Introduction: Increasing cost pressures in a competitive global environment, coupled with constantly growing levels of product and process complexity, means that advanced production planning skills are now a key factor of success for many manufacturing companies. To produce competitively, it is necessary not only to ensure the efficient operation of the production structures, but also to be in a position to plan and design these to respond to specific requirements and at a high level of quality. Constantly shortening planning and development times and, thus, reducing time-to-market is a crucial component of economic success in today’s markets. In parallel with product design, and prior to the initial start of production (SOP), production planning is a business process that has great potential with respect to improving product and process planning. Researching, generating, processing, and transferring information are important aspects of production planning. Depending on the level of maturity of the planning and the respective planning discipline (see Clause 4), definable information packages emerge, which are generated iteratively during planning, and processed further through the overall planning process. The resulting information flows are followed via a reference planning process. This helps to specify the state of information at defined points during planning. The comparison of actual states against target states of information packages is performed at these defined points (see Annex A
Scope: This document describes the information flows identified for each planning discipline within production planning, according to ISO 18828-2. The following aspects are within the scope of this document: — general overview of the main information flows within the reference planning process; — basic pattern to describe the main information flows; — detailed description of every main information flow; — state notation structure of the main information flows objects; — detailed descriptions for each information object state; — proposal of checklists for benchmarking information objects. The following items are outside the scope of this document: — information flows to intersecting areas, including high-level planning; — data models for production planning; — complete description of all possible information flows/objects within production planning; — workflow engines for automated production planning; — production facilities planning/manufacturing facilities planning (physical plant and equipment); including any kind of resource that is not directly related to the manufacturing process; — value chain (inbound logistics, operations management, outbound logistics, marketing and sales); — process simulation/safeguarding; — investment planning during production process management.