Information technology - Data centre facilities and infrastructures - Part 7: Management and operational information
Introduction: The unrestricted access to internet-based information demanded by the information society has led to an exponential growth of both internet traffic and the volume of stored/retrieved data. Data centres are housing and supporting the information technology and network telecommunications equipment for data processing, data storage and data transport. They are required both by network operators (delivering those services to customer premises) and by enterprises within those customer premises. Data centres need to provide modular, scalable and flexible facilities and infrastructures to easily accommodate the rapidly changing requirements of the market. In addition, energy consumption of data centres has become critical both from an environmental point of view (reduction of carbon footprint) and with respect to economical considerations (cost of energy) for the data centre operator. The implementation of data centres varies in terms of: a) purpose (enterprise, co-location, co-hosting, or network operator facilities); b) security level; c) physical size; d) accommodation (mobile, temporary and permanent constructions). The needs of data centres also vary in terms of availability of service, the provision of security and the objectives for energy efficiency. These needs and objectives influence the design of data centres in terms of building construction, power distribution, environmental control and physical security. Effective management and operational information is required to
Scope: This document specifies processes for the management and operation of data centres. The primary focus of this document is the operational processes necessary to deliver the expected level of resilience, availability, risk management, risk mitigation, capacity planning, security and energy efficiency. The secondary focus is on management processes to align the actual and future demands of users. Figure 2 shows an overview of related processes. The transition from planning and building to operation of a data centre is considered as part of the acceptance test process in Clause 6. Figure 2 — Data centre management processes overview NOTE 1 Only processes specific for data centres are in the scope of this document. Business processes like people management, financial management, etc. are out of scope. NOTE 2 Specific skill sets are required of those working in and operating a data centre. TECHNICAL SPECIFICATION ISO/IEC TS 22237-7:2018(E) © ISO/IEC 2018 – All rights reserved ISO/IEC TS 22237-7:2018(E) 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO/IEC TS 22237-1:2018, Information technology — Data centre facilities and infrastructures — Part 1: General concepts ISO/IEC TS 22237-2, Information technology — Data centre facilities and infrastructures — Part 2: Building construction ISO/IEC TS 22237-3, Information technology — Data centre facilities and infrastructures — Part 3: Power distribution ISO/IEC TS 22237-4, Information technology — Data centre facilities and infrastructures — Part 4: Environmental control ISO/IEC TS 22237-5, Information technology — Data centre facilities and infrastructures — Part 5: Telecommunications cabling infrastructure ISO/IEC TS 22237-6, Information technology — Data centre facilities and infrastructures — Part 6: Security systems 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions For the purposes of this document, the terms and definitio