Ships and marine technology — Marine environment protection — Arrangement and management of port waste reception facilities
Introduction: The development of adequate port waste reception facilities (PRFs) for ship-generated waste and cargo residues is a major factor in the management of each of the shipboard waste streams covered by the International Convention for the Prevention of Pollution from Ships (MARPOL[1]) Annexes I to VI, as amended, excluding Annex III (packaged dangerous goods). MARPOL[1] requires the Parties to ensure the provision of adequate reception facilities in ports to receive these wastes. The Parties to MARPOL[1] are required to implement legislation to provide for PRFs. Regional and intergovernmental legislation has also been developed. However, due to operational, ownership, geographic and legislative differences in ports, there is a large disparity in how operations are conducted. To overcome some of the major issues, the International Maritime Organization (IMO), through its Sub-Committee on Implementation of IMO Instruments (III) [formerly the Sub-Committee on Flag State Implementation (FSI)] developed an action programme to tackle the inadequacy of PRFs. Then, IMO adopted MEPC.83(44) Guidelines for Ensuring the Adequacy of Port Waste Reception Facilities.[4] To obtain the most efficient management of waste and to reduce the time and resource burden in segregating and handling waste in the ports, the concept of waste minimization has been integrated into this document by incorporating the following principles: — for waste generated aboard a ship: “Prevention before recycling, before e
Scope: This document provides requirements and guidance on the provision, arrangement, operation, management, use and design of port waste reception facilities (PRFs). In doing so, it provides a method for addressing ship-generated waste, cargo residues and operational residues at ports when the waste and residues are offloaded from the ship. This document addresses principles and issues on: — the development of a port waste management strategy; — the design and operation of PRF; — PWMP development, implementation and compliance; and — PRF management and accountability. This document is designed to be used by ports and terminals with existing PRFs that aim to refine their systems. It can also be used by new ports and terminals that are developing PRFs. This document has been designed to be used by ports and terminals of any size. It does not give specifics on the size or location of a PRF in each port, but provides a list of principles to be considered and applied to any size of type of port or terminal (e.g. marina, fishing port, container terminal, oil terminal, roll on/roll off terminal, cruise terminal, ferry terminal, bulk or general cargo terminal, ship repair or recycling facility, and offshore terminal). NOTE For inland ports and marinas and those ports that have entered regional arrangements for the provision of a PRF for inland operated vessels, refer to ISO 24146-2[8].