ISO IWA 33-3-2021 PDF

Technical guidelines for the development of small hydropower plants-Part 3: Design principles and requirements

$145.50 $291.00 -50%
Product Code: ISO IWA 33-3
Stock In Stock
Edition: 1ST
Published: 03/2021
Number of Pages: 90
File Size: 1 file, 3 Bytes

Available Options

Product Description

Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements

Introduction: Small hydropower (SHP) is well recognized as an important renewable energy solution to the challenge of increasing access to electricity in remote rural areas. However, while most countries in Europe, North and South America, China and India have high degrees of installed capacity, the potential of SHP in many developing countries remains untapped and is hindered by a number of factors, including the lack of best practices or standards for SHP development. The technical guidelines for the development of small hydropower plants contained in this document address the current limitations of the regulations applied to technical guidelines for SHP plants by applying the expertise and best practices that exist across the globe. It is intended for countries to utilize this document to support their current policy, technology and legislation. Countries that have limited institutional and technical capacities will be able to enhance their knowledge base in developing SHP plants on rivers/streams and existing water resource structures outlets such as dams, barrages, navigation lock, canal falls, outfalls and flowing water (kinetic flow), including renovating/upgrading the old SHP plants, thereby attracting more investment in SHP projects, encouraging favourable policies and subsequently assisting in economic development at a national level. This document will be valuable for all countries, but also allow for the sharing of experience and best practices between countries. This document

Scope: This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments. Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

Be the first to write a review for this product.

Write a review

Note: HTML is not translated!
Bad           Good
ISO IWA 33-3-2021 PDF

ISO IWA 33-3-2021 PDF

$145.50 $291.00