Well integrity - Part 2: Well integrity for the operational phase
Introduction: This Technical Specification has been developed by producing operating companies for oil and gas, and is intended for use in the petroleum and natural gas industry worldwide. This Technical Specification is intended to give requirements and information to the Well Operator on managing well integrity for the operational phase. Furthermore, this Technical Specification addresses the minimum compliance requirements for the Well Operator, in order to claim conformity with this Technical Specification. It is necessary that users of this Technical Specification are aware that requirements above those outlined in this Technical Specification can be needed for individual applications. This Technical Specification is not intended to inhibit or replace legal requirements; it is in addition to the legal requirements; where there is a conflict the legal requirement always takes precedence. This can be particularly applicable where there is innovative or developing technology, with changes in field or well design operating philosophy. This Technical Specification addresses the process of managing well integrity by assuring compliance to the specified operating limits for identified well types, that are defined based on exposure of risk to people, environment, assets and reputation, supported by associated well maintenance/monitoring plans, technical reviews and management of change. The following terminology is used in this Technical Specification. a) The term “shall” or “must” denotes a
Scope: This Technical Specification provides requirements and methods to the oil and gas industry to manage well integrity during the well operational phase. The operational phase is considered to extend from handover of the well after construction, to handover prior to abandonment. This represents only the period during the life cycle of the well when it is being operated and is illustrated in Figure 1. The scope of the Technical Specification includes: — A description of the processes required to assess and manage risk within a defined framework. The risk assessment process also applies when deviating from this Technical Specification. — The process of managing well integrity by operating wells in compliance with operating limits for all well types that are defined based on exposure of risk to people, environment, assets and reputation. The management of well integrity is supported by associated maintenance/monitoring plans, technical reviews and the management of change. — The assessment of existing assets (wells / fields) in order to start the process of Well Integrity Management in accordance with this technical specification. — The handover process required when changing from one activity to another during the operational phase. The scope of the Technical Specification applies to all wells that are utilized by the oil and gas industry, regardless of their age, type or location. The scope of the Technical Specification does NOT apply to: — The periods during well intervention or work-over activities but it DOES include the result of the intervention and any impact that this can have to the well envelope and the associated well barriers. — The equipment that is required or used outside the well envelope for a well intervention such as wire-line or coiled tubing or a pumping package. TECHNICAL SPECIFICATION ISO/TS 16530-2:2014(E) © ISO 2014 – All rights reserved ISO/TS 16530-2:2014(E) Well Planning Well Construction Well Hand- over Well Operational Phase Well Intervention or Workover Well Hand- over Well Hand- over Well Abandonment Detailed Well Design Figure 1 — Illustration of the scope of this Technical Specification 2 Normative references The following documents
Contents:
- Foreword
- Introduction
- Scope